October was mostly spent failing to remove some big boulders at the end of the dig.

Then November was mostly spent either sumped out or involved with other jobs.

So come December we decided to get back on with it. After the heavy floods the hose had managed to flush some of the end away, but unfortunately the pipe had come off the dam at some point so not much change since the Octobber visit.

This was an evening trip with Simon, Dave and Rob. We spent this trip removing the ~20 bits of boulders. Where the boulders had dropped from did not look very hopefuly, so we set to digging the lefthand side to see where the walls and floor go.

Shame the Wanted is still closed, so back to the Red'n for a pleasant pint.

Joomla templates by a4joomla