I have begun work in the
north-west rift in Peak Cavern's
Buxton Water Aven. Jim Lister is taking some time out from Doom's
Retreat to
assist. Buxton Water Aven is 63m upstream in Buxton Water Sump and has
been the
subject of work by various divers, most recently by Mark Wright in
1999, but the
top remains to be reached. The major challenge posed by the aven is the
quantity
of loose rock which threatens to fall into the ~3m diameter sump pool
and block
the exit. Work is being carried out to install a series of mesh shields
in the
rift to catch smaller pieces and a scaffold frame to keep the sump exit
open.
When this preparatory work is complete I plan to continue climbing from
Mark's
high point (57m above sump level).
Report by
Jules Barrett - 30/08/2007
Divers: Jules Barrett
(EPC), Jim
Lister (TSG & EPC)
Support: Martyn Grayson (TSG),
Jenny Rushbrook (TSG)
JB and JPL dived a drill, bolting
equipment, bolt croppers
and associated kit into Buxton Water Aven. JB spent a good few hours in
the
north-west rift placing a number of bolts which will be used to anchor
a mesh
shield.
|